MOGCL LACT Unit Projects
Project Overview:
TISL was tasked with multiple projects related to the LACT (Lease Automatic Custody Transfer) Unit for MOGCL, involving the installation and termination of cables, electrical distribution panels, and other critical components. These projects were crucial for ensuring accurate and reliable measurement and transfer of crude oil at MOGCL’s facilities. The work included the installation of sample lines, electrical distribution panels, and the termination of instrument cables in the LACT panel within the control room.
Strategy and Approach:
The strategy for these projects was to ensure the precise installation and termination of all components within the LACT Unit, enabling accurate custody transfer operations. TISL’s approach was to meticulously follow industry standards and best practices, ensuring that all installations were done correctly and efficiently. The projects required careful coordination with MOGCL’s operations team to minimize disruptions and ensure seamless integration with existing systems.
Design and Implementation:
TISL’s work on the LACT Unit projects involved the installation of sample lines and the termination of instrument cables in the LACT panel within the control room. The projects also included the installation of electrical distribution panels, which were carefully placed and connected to ensure reliable power distribution. TISL’s team of engineers and technicians worked with precision to ensure that all components were installed correctly and that the systems were fully operational. The successful completion of these projects underscores TISL’s expertise in delivering high-quality engineering services for the oil and gas industry.
Client Collaboration:
Throughout the LACT Unit projects, TISL maintained close communication with MOGCL’s operations and engineering teams. This collaboration was essential in ensuring that the projects were completed on time and to the client’s specifications. Regular progress updates and site visits were conducted to ensure that all aspects of the projects were executed to the highest standards. The successful completion of these projects reflects the strong partnership between TISL and MOGCL.
Environmental Impact:
TISL ensured that all work related to the LACT Unit projects was carried out with a focus on environmental sustainability. The installations were designed to minimize the risk of leaks or spills, reducing the environmental impact of custody transfer operations. Additionally, TISL incorporated energy-efficient technologies and practices into the installation process, further contributing to the environmental sustainability of MOGCL’s operations.