Project Overview:
TISL was tasked with conducting a comprehensive Power Audit for the Electrical Systems Installation at the United Bank for Africa (UBA) Enugu Branch offices. This project was critical in ensuring that the branch’s electrical infrastructure met operational needs, safety standards, and efficiency requirements. Completed in 2022, the power audit provided valuable insights that informed necessary upgrades and improvements, ensuring the branch’s electrical systems were optimized for performance and safety.

Strategy and Approach:
The strategy for this power audit was to conduct a thorough assessment of the branch’s electrical systems, including all installations and equipment. TISL’s approach was to identify any potential issues that could affect the safety, efficiency, or reliability of the electrical infrastructure. The audit covered a wide range of aspects, from illumination level checks to a detailed review of the electrical installations, ensuring that all systems were in compliance with industry standards and regulations.

Design and Implementation:
The power audit involved an extensive evaluation of the entire electrical system within the UBA Enugu Branch offices. TISL’s team of experts conducted tests to measure illumination levels, assessed the condition of wiring and electrical panels, and evaluated the overall system’s ability to meet the branch’s power demands. The audit also included a review of the branch’s energy consumption patterns, providing recommendations for reducing energy usage and improving efficiency. The findings of the audit were compiled into a detailed report, which included actionable insights and strategic recommendations for optimizing the branch’s electrical infrastructure.

Client Collaboration:
TISL worked closely with UBA’s facility management team throughout the audit process. This collaboration was crucial in gaining a thorough understanding of the branch’s operational needs and any concerns related to the electrical systems. Regular meetings and discussions ensured that the audit was aligned with UBA’s goals and that the final recommendations were practical and actionable. The successful completion of the audit has strengthened TISL’s relationship with UBA and demonstrated our expertise in providing high-quality electrical engineering services.

Environmental Impact:
As part of TISL’s commitment to sustainability, the power audit also focused on identifying opportunities for reducing the branch’s energy consumption. The audit revealed several areas where energy efficiency could be improved, leading to recommendations for upgrading lighting systems, optimizing power usage, and reducing waste. These recommendations not only help reduce the branch’s environmental impact but also contribute to cost savings for UBA.